Celebrities contribute to Katrina relief

Published:Wednesday, September 7, 2005Updated:Saturday, September 10, 2005 (Travolta, Preston, Moore, Stones, Three Doors Down, Johnson, Smith)

After Hurricane Katrina passed across the United States, various artists and media stars have leapt at a call to action.

John Travolta and wife Kelly Preston flew his private plane to deliver a load of supplies and tetanus vaccine to Baton Rouge and New Orleans. Part of a Scientology project which has been using their non-massage “assists”, in an interview Preston mentioned that “auditing” had also been performed on victims.

Kevin Smith is holding an online auction on his Web site.

Sean Penn actually went to Louisiana. After loading down a small boat with his entourage, it was discovered one of them had neglected to seal a hole in the bottom. Penn was wearing a white vest rather than a life vest while bailing. After the motor wouldn’t start, the crew paddled down a flooded New Orleans street. Bystanders jeered at whether any victims could fit aboard the crowded craft. No report on rescue stunts. Local authorities had previously been criticized for not allowing volunteer boaters in to help.

Morgan Freeman, whose home fared well, is organizing an online auction of celebrity items at charityfolks.com, to benefit the American Red Cross Disaster Relief Fund.

Curt Schilling opened his home to a family of nine driven out of their New Orleans home. The Schilling family will provide housing for the Fields for a year while their home in New Orleans is rebuilt and repaired.

Some celebrities “graced” disaster zones with their presence in the days following Katrina.

Singer Macy Gray and television personality Phil McGraw visited Houston’s Astrodome.

Celebrities visiting New Orleans include Michael Moore (opposite side of lake), singer Harry Connick, Jr., CNN’s Anderson Cooper, actor Jamie Foxx, singer Faith Hill, actor Matthew McConaughey, singer Lisa Marie Presley, comedian Chris Rock, and The Oprah Winfrey Show contributor Lisa Ling and interior decorator Nate Berkus.

Oprah Winfrey visited New Orleans, Houston, and Mississippi.

Retrieved from “https://en.wikinews.org/w/index.php?title=Celebrities_contribute_to_Katrina_relief&oldid=4577607”
Posted in Uncategorized

Students in Rhode Island school attacked by wasps

Monday, September 21, 2009

Dozens of students and teachers were stung by yellow jacket wasps Monday at a middle school in Cranston. The attack occurred around 10:45 a.m., according to Ray Votto, the chief operating officer for Cranston Public Schools.

It is suspected that during a routine fire drill, students exiting the building disturbed the wasps’ nest in a field behind the school. Votto said, “When kids exited towards the back of the school building near our portable classrooms, they walked into a field and may have disrupted a nest”.

The Cranston Fire Department and school nurses responded to the scene to provide medical assistance. A total of 25 students, one of whom was hospitalized, and four teachers were stung, some multiple times. All of the students and one teacher were sent home.

Retrieved from “https://en.wikinews.org/w/index.php?title=Students_in_Rhode_Island_school_attacked_by_wasps&oldid=3291976”
Posted in Uncategorized

Space Shuttle Discovery launches on mission STS-124

Saturday, May 31, 2008

Space Shuttle Discovery has successfully launched from Launch Complex 39A at the Kennedy Space Center in Florida, beginning mission STS-124. Discovery will deliver the main pressurised module of the Japanese Experiment Module to the International Space Station. Lift-off occurred at 21:02:12 GMT this evening, with the ascent to an initial sub-orbital trajectory lasting approximately eight and a half minutes. Orbital insertion occurred shortly afterwards, with a circularisation burn which concluded at 21:42 GMT.

This is the third Space Shuttle mission of 2008. STS-124 is the second of three missions to assemble the Japanese Experiment Module, also known as Kibo. The JEM Pressurised Module (JEM PM or JPM) is the largest laboratory module of the International Space Station, and one of the largest payloads ever launched by the Space Shuttle. The main Japanese robot arm, or RMS, will also be launched on this mission. Discovery’s mission is scheduled to last for fourteen days, however it can be extended by two days if necessary. Three spacewalks, or EVAs, are planned to be conducted.

STS-124 has a crew of seven astronauts; Mission Commander Mark E. Kelly, Pilot Kenneth Ham, Mission specialists Karen L. Nyberg, Ronald J. Garan, Michael E. Fossum and Akihiko Hoshide, and Expedition 17 crewmember Gregory Chamitoff. All crewmembers are American, except Hoshide, who is Japanese. The astronauts were awoken at 11:30 GMT on launch day, and began preparations for their launch. This is the first spaceflight for Ham, Nyberg, Garan, Hoshide and Chamitoff, the second for Fossum, and the third for Kelly. The launch coincides with Kelly’s father’s birthday.

Preparations for launch had been underway for several months. The External Tank arrived at the Kennedy Space Center in late March. Following tests in a checkout cell, it was mated with two solid rocket boosters which had been assembled on a Mobile Launch Platform. Discovery was then rolled from the Orbiter Processing Facility to the Vehicle Assembly Building for mating with the External Tank and boosters. Rollover occurred in late April, and was followed by rollout to the launch pad about a week later.

The Kibo pressurised module arrived at the Kennedy Space Center in May 2003 by ship. It was then moved to the Space Station Processing Facility. Electrical interface tests with the Harmony node were conducted in August 2003. At the end of April 2008, the module was placed in a transportation canister, and moved to the launch pad. The payload arrived at the launch pad about a week ahead of the Shuttle. Once Discovery arrived at the launch pad, the module was placed into Discovery’s payload bay. Owing to the size of the payload, there was no room in Discovery’s’ payload bay for the Orbiter Boom Sensor System (OBSS), a safety device used primarily to inspect the Shuttle Orbiter’s heat shield. As a result of this, Endeavour left its OBSS at the International Space Station, during the last Shuttle Mission, STS-123. Discovery’s crew will collect this during an EVA.

Fueling of Discovery’s External Tank in preparation for launch began at 11:50 GMT. By 12:50, it had been confirmed that initial tests on Engine Cutoff (ECO) sensors in the External Tank had been conducted successfully. ECO sensor failures had caused a number of delays to recent Shuttle launch attempts, and STS-124 is the first mission to use a modified tank, which is intended to eliminate such faults. At the time at which tanking began, weather forecasters predicted an 80 percent chance of acceptable conditions at the scheduled launch time. Fuelling was completed, and topping up of cryogenic propellant began, at 15:36. In addition to the ECO sensor modifications, this was the first mission to use an External Tank manufactured after the Columbia accident in 2003, and therefore the first tank to have all safety enhancements built into it, rather than retrofitted.

The terminal countdown resumed after a planned hold at T-3 hours, at 17:07 GMT. Crew walkout from the Operations and Checkout building at the Kennedy Space Center occurred at 17:12. Following walkout, the crew boarded a bus known as the “astrovan”, which was used to transport them to the launch pad. The crew arrived at the launch pad at 17:31, and began boarding Discovery at 17:38. As Mission Commander, Mark Kelly was the first to board the orbiter. He was followed by Chamitoff at 17:42, Ham at 17:52, Fossum at 17:55, Nyberg at 18:08 and Hoshide at 18:11. Ron Garan was the last to board the orbiter at 18:21. Pad technicians known as the closeout crew, assisted the astronauts with boarding the Shuttle, and getting strapped in. The pad technicians were cleared to close the orbiter’s access hatch at 19:02 GMT, and the hatch door was closed two minutes later at 19:04. Sealing the hatch was completed at 19:54.

A scheduled ten-minute hold at T-20 minutes began at 19:47 GMT. During this hold, the closeout crew put thermal insulation plugs into screwholes on the orbiter’s hatch, removed protective covers, and disassembled the white room, a collapsible structure at the end of the crew access arm which is used to access the spacecraft. The countdown resumed at 19:57. At that time, no problems were being worked.

The final built in hold, at T-9 minutes and lasting for 45 minutes and 12 seconds, began at 20:08. During this hold, flight controllers set the exact launch time to be 21:02:12 GMT, and confirmed that the launch window would end at 21:08:59 GMT. The countdown was set to resume at 20:53:12. Shortly before the end of the hold, the launch director described conditions as a “gorgeous day to launch”, and wished the crew “good luck and Godspeed”. Mark Kelly thanked him, and replied “whilst we tend to live for today, Discovery, with Kibo, will certainly deliver hope for tomorrow”. Countdown resumed on time at the end of the hold, and the automated Ground Launch Sequencer was initiated.

When giving clearance to retract the Orbiter Access arm from the Shuttle, seven minutes before launch, the Orbiter Test Conductor wished the crew “best of luck delivering JEM to the International Space Station”. Four minutes before launch, the engines were purged of gasses, and tests of the flight control surfaces began. Liquid hydrogen tanks were pressurised shortly after at T-3 minutes, and the fuel vent cap was retracted. Two minutes before lift-off, the crew were instructed to close and lock their visors, and the liquid oxygen tank was pressurised. At T-50 seconds, the orbiter switched to internal power, and the Shuttle’s flight computers took over control of the countdown at T-31 seconds.

Launch occurred on schedule at 21:02:12 GMT. The Solid Rocket Boosters separated about 120 seconds into the flight, and around eight and a half minutes after launch, the Main Engines (SSMEs) shut down, and the External Tank was jettisoned. At this time, Discovery was on a 65km x 217km x 51.6° sub-orbital trajectory. Orbital insertion followed about thirty minutes later, with a firing of Discovery’s OMS engines. This burn started at 21:39 GMT, and ended at 21:42, lasting two minutes and 44 seconds.

At the time of launch, the International Space Station was flying over the Atlantic Ocean, South-East of Canada. Following launch, a fault was detected with the backup electrical system controlling the left OMS engine gimbal actuator. As it was a backup, flight controllers predicted that it would have no effect on the mission, and all scheduled burns will go ahead. The fault was later traced to the failure of both transducers in the unit, and it was reported that the problem was probably due to an equipment malfunction as opposed to a faulty sensor. When asked about the faulty actuator, NASA Administrator Mike Griffin stated that at the “worst case it would be a loss of redundancy but we will still be able to use that system”. Discovery’s payload bay doors were opened at 22:35 GMT. At 23:09, the crew were cleared to begin on-orbit operations.

Processing and countdown progressed smoothly, and were described by Discovery’s processing and launch flow director, Stephanie Stilson, as being “a very clean flow”. Mission Commander Mark Kelly remarked that there had been a “historic low on spacecraft issues”. Around four hours prior to launch, Stilson remarked that there had been 73 anomalies detected so far. The smallest number of anomalies during the countdown for a previous mission was 76, for STS-103.

Moron AFB in Spain was considered the primary transoceanic abort landing (TAL) site, should an engine failure, or other major problem have occurred during early ascent. Istres in France was considered the backup TAL site. The weather at both of these sites was good, however no abort was required during the launch.

This is the 123rd Space Shuttle mission, and the 35th to be flown by Discovery. Ten further missions are planned, including two contingency logistics flights, prior to the Shuttle’s retirement in 2010. Discovery is assigned to three of these missions. It is next scheduled to fly in early 2009, on mission STS-119. The next Space Shuttle mission will be conducted by Atlantis, which will fly STS-125, the final mission to service the Hubble Space Telescope. This is the fourth manned, and 27th orbital launch of 2008.

At a press conference following launch, NASA Administrator Mike Griffin stated that it was “a huge day for the space station partnership”, and that the International Space Station was “a place in orbit where we can learn to live and work in space”. He congratulated JAXA on the launch of the Japanese Experiment Module, saying that “Japan has now built a first class laboratory…which is capable of supporting humans in space”, and that “with this step Japan has shown itself to be capable of performing at the highest levels of space exploration”. Griffin also stated the STS-124 is “an essential step” in the Space Station programme. When asked by a reporter how he felt about recent NASA successes, including the STS-124 launch, and the landing of the Phoenix probe on Mars last Sunday, he joked that it felt “so great that not even having to do a press conference, two press conferences in a week can ruin it”. When asked about the difficulty of what NASA was doing, he remarked that flight controllers “make it look easy”, but “it is so far from being easy that I could talk until 6am tomorrow, and I wouldn’t touch on how difficult it is”.

NASA Associate Administrator for Space Operations Bill Gerstenmaier said that it was “a great day for the launch”, and described STS-124 as a “pretty challenging mission”. Gerstenmair stated that five foam debris impacts had been identified during ascent, but that NASA “don’t consider this a big deal, they were all late”. When asked what he meant by ‘late’, he explained that after 123 seconds into the flight, pieces of falling foam debris “can’t build up enough velocity to hit the orbiter, or if they hit the orbiter they will just bounce off” He went on to say that “things look really well and look really good”, and that NASA have “no concern” about foam, “It’s not an issue to us”.

Launch Integration manager LeRoy Cain described it as a “flawless countdown and a flawless launch”. He said that STS-124 is “a big milestone for us”, and went on to explain that “this is the most important mission we have going right now”. He also stated that the “tank’s performance looks really good”.

Launch Director Mike Linebach stated that it was a “Fantastic launch”, that was tying for the lowest faults during a countdown, with 74 issues reported. Stephanie Stilson has previously stated that the record was 76 issues, so it is unclear whether STS-124 has set a new record, or is tying with the previous record. Linebach went on to describe the launch as “outstanding”.

Keiji Tachikawa, the President of JAXA said that he “was very delighted to see the Shuttle Discovery successfully launched”. He stated that the Kibo module would “significantly enhance the capability to perform experiments in orbit”, and that experiments conducted aboard the Space Station, and the Kibo module, would lead to “better daily lives for the people of our planet”. He also expressed his “profound appreciation to NASA, and all international and domestic organisations” involved in the launch, explaining that the mission is “very significant to Japan”.

Retrieved from “https://en.wikinews.org/w/index.php?title=Space_Shuttle_Discovery_launches_on_mission_STS-124&oldid=4572497”
Posted in Uncategorized

Police in Texas arrest man eating dead girlfriend

Monday, January 7, 2008

Christopher Lee McCuin, 25, from Tyler, Texas in the United States has been arrested after police found him possibly preparing to eat the body parts of his dead girlfriend, Jana Shearer aged 21. He was also charged with stabbing his ex-wife’s boyfriend, William Veasley, 42.

According to reports, Shearer’s mother was told by McCuin to “look in the garage” where she discovered the mutilated body of her daughter. She then flagged down a police officer on the road.

McCuin called 911 after the mother left the house. According to reports, he told the dispatcher that he was boiling Shearer’s body parts and preparing to eat them. When police got to his home, they discovered one of Shearer’s ears boiling in a pot, and an unnamed piece of her flesh on the kitchen table, with silverware placed beside it. The rest of her body had several “chunks” missing from it, according to the Tyler Morning Telegraph quoting Sheriff J.B. Smith of the Smith County Sheriff’s Department.

Police later found out that McCuin had stabbed his ex-wife’s boyfriend, and also broke into Tyler Custom Openings, a local business, sometime on Friday or Saturday. He started by going to Shearer’s home on Friday January 4 to have a discussion with her, but she was never seen alive again. Before stabbing Veasley, he beat Shearer “with a blunt object, multiple times” to death. On Saturday morning, he arrived at his ex-wife’s home and fought with Veasley, stabbing him. He is currently in critical condition at a local hospital.

McCuin then broke into the Tyler Custom Openings and then went to his mother’s house where he took her to his home to show her what he had done. Although McCuin was inside the house when police arrived, he was able to escape and was chased for a short distance before being caught again.

McCuin is currently being held on a US$2,000,000 bail at Smith County jail.

Retrieved from “https://en.wikinews.org/w/index.php?title=Police_in_Texas_arrest_man_eating_dead_girlfriend&oldid=1700064”
Posted in Uncategorized

Several episodes of ‘Orange is the New Black’ released prematurely by hacker

Tuesday, May 2, 2017

A hacker, or group of hackers, operating under the alias of The Dark Overlord uploaded ten episodes of Netflix’s web TV series Orange is the New Black on Friday and Saturday on The Pirate Bay after they said the online streaming service failed to meet their demands. Netflix had planned to release the season on June 9.

According to The New York Times, the unreleased content from the upcoming fifth season of Orange is the New Black was likely stolen from a postproduction company Larson Studios, based in Los Angeles. Netflix in a statement said, “A production vendor used by several major TV studios had its security compromised and the appropriate law enforcement authorities are involved.” In a tweet on Saturday, the hacker said, “Who is next on the list? FOX, IFC, NAT GEO, and ABC. Oh, what fun we’re all going to have. We’re not playing any games anymore.”

The hacker tweeted about uploading the first episode on The Pirate Bay on Saturday saying, “Let’s try to be a bit more direct, Netflix”. The hacker allegedly demanded an amount of money which they publicly described as “modest”, from Netflix for not releasing the episodes prematurely. The New York Times reported that the final three episodes were not pirated since the security breach occurred before the postproduction studio was handed those episodes. In January, the hacker erased the data from the servers of a Muncie-based charity called Little Red Door Cancer Services of East Central Indiana demanding 50 bitcoins to restore their data, which was estimated to be about US$43,000.

The Federal Bureau of Investigation is reportedly investigating this cyber crime. Netflix has more than 100 million subscribers, CEO Reed Hastings announced recently. Variety noted that Netfilx’s shares experienced a 0.57% loss on the day the first episode was uploaded by the hacker.

Retrieved from “https://en.wikinews.org/w/index.php?title=Several_episodes_of_%27Orange_is_the_New_Black%27_released_prematurely_by_hacker&oldid=4576711”
Posted in Uncategorized

Last British volume car manufacturer closes down

Friday, April 15, 2005

The last British-owned volume car manufacturer, MG Rover, has closed down, with the loss of 5,000 jobs.

International accounting firm PriceWaterhouseCooper was brought in last week to put the company into administration. Today PwC announced that MG Rover’s only hope, the Chinese car company SAIC, had no interest in buying the ailing firm. With no further source of revenue, PwC has closed the company’s factory in Longbridge, Birmingham and has laid off 5,000 workers.

Some 1,000 workers will continue for a while to complete the remaining cars left on the production line.

The BBC reported PwC joint administrator Tony Lomas as saying “We’ll explore what we would describe as the break-up of the business, we will carry on with the interested parties who want to talk about pieces of the business.”. PwC said around 70 offers for various parts of the company had been made but no serious offers of money made.

Recent efforts to save the company had been centered on convincing SAIC (Shanghai Automotive Industry Corp.) to buy the company as a going concern, but the Chinese company stated it would only buy the company if it’s financial position could be guaranteed to be secure for at least two years. The British government could not make such a commitment due to European Union trade and competition rules.

The SAIC company did buy the designs for the 75 and 25 models and for the K-Series engines for £67m.

The Rover car company has a long but troubled history. It was formed in 1968 after a series of mergers of existing car manufacturers, and was nationalized in 1975 after it ran into financial difficulties. In 1979 a long-running deal to collaborate on developing new vehicles was established with the Japanese company Honda. In 1988 the company was privatized and was bought by British Aerospace. In 1994 British Aerospace sold the business to BMW, who then sold the Land Rover brand to Ford and finally sold the company in 2000 for just £10, retaining the well-known Mini brand for themselves. The MG Rover company was run by a private group until its collapse.

MG Rover has not launched a new model since the 75 was introduced in 1998 during the period of ownership by BMW. Their next newest model was the 25, originally launched as the 200 series some ten years ago. Rover also produced the 45, which dates from 1990, and the ZF sports car first launched in 1995. Sales of Rover cars accounted for just 3% of the UK car market in 2004.

Tony Blair announced a £150 million support package for the recently unemployed workers of the MG Rover plants, though it has been claimed that his generous offer may be more as a result of the nearby marginal seats in the upcoming elections than compassion on his part.

Retrieved from “https://en.wikinews.org/w/index.php?title=Last_British_volume_car_manufacturer_closes_down&oldid=2496425”
Posted in Uncategorized

California teen becomes youngest to conquer Everest

Monday, May 24, 2010

Jordan Romero, a thirteen-year-old alpinist from Big Bear Lake, California, is the youngest person to have summited Mount Everest, according to reports circulated by the Associated Press quoting a spokesman based in the United States. The expedition included the boy’s father, stepmother, and three Sherpa guides.

Romero ascended 8,850 metres (29,035 feet) breaking the record for the youngest climber on Everest previously set by 16 year old Temba Tsheri from Nepal. “It’s something I’ve always wanted to do before I die — I just happen to be doing it at this age. I happen to be going for a world record. But I just want to climb it,” Jordan told AFP reporters before embarking on the trek. On the same day, mountaineer Apa Sherpa, from Nepal, scaled Everest for the 20th time breaking a personal record.

It is anticipated that additional information will become available once the summit team returns to camp on the Tibet side of the mountain.

Retrieved from “https://en.wikinews.org/w/index.php?title=California_teen_becomes_youngest_to_conquer_Everest&oldid=4506386”
Posted in Uncategorized

U.S. drones enter Libya conflict

Saturday, April 23, 2011

The first attacks carried out by United States Predator drones in Libya reportedly occurred today, as the Pentagon confirmed a strike carried out by the U.S. Air Force but declined to give further details.

According to Pentagon spokesperson Darryn James, a captain in the U.S. Navy, the attack happened sometime Saturday, but withheld other information. According to the Pentagon, “common practice” regarding drone operations is to provide no more information than to confirm an attack. NATO later revealed the target was a multiple rocket launcher in the Misrata area. A statement from NATO said that, “[t]he MRL system had been used against civilians in Misrata.”

Robert Gates, the US Defense secretary, announced Thursday that President Barack Obama had given permission for drones to be used in the conflict due to their “unique capabilities.” Previously, drones had been used only in a surveillance role.

General James Cartwright, an official with the U.S. Joint Chiefs of Staff, said that drones have an “ability to get down lower and therefore, to be able to get better visibility, particularly on targets that have started to dig themselves into defensive positions,” a benefit in Libya, where pro-Gaddafi forces are increasingly taking cover near civilian populations. Drones are able to make more precise attacks, which lowers the risk of civilian casualties in such areas.

Retrieved from “https://en.wikinews.org/w/index.php?title=U.S._drones_enter_Libya_conflict&oldid=4590882”
Posted in Uncategorized

Category:July 15, 2010

? July 14, 2010
July 16, 2010 ?
July 15

Pages in category “July 15, 2010”

Retrieved from “https://en.wikinews.org/w/index.php?title=Category:July_15,_2010&oldid=1924516”
Posted in Uncategorized

Apache pipeline fire – Varanus Island, Western Australia

Wednesday, June 4, 2008

A pipeline rupture and fire at Apache Corporation‘s Varanus Island facility in Western Australia has reduced the supply of natural gas to Western Australia by 30%. 153 employees have been evacuated and 13 employees remain on the island to monitor the situation.

Steven Farris, Apache’s president and CEO said “No one was injured, all personnel are safe, and the rupture and fire appear to be contained on the island…At this time, we cannot estimate when throughput will be resumed.” The facility was producing approximately 330 million cubic feet(MMcf) of natural gas and 8,000 barrels of crude oil per day, this has been reduced to 200 MMcf and 5,000 barrels per day.

Western Australian Minister for Energy Fran Logan said that residential supplies were unlikely to be affected but has called on Western Australians to conserve the use of natural gas. Minister Logan said that Apache supplies primarily large volume users like Alinta Gas and Alcoa, and the major industrial users will be hit the hardest. The aluminum refineries owned by Alcoa, which are dependent on natural gas, have switched to diesel to maintain production.

Apache representatives, including its managing director Tim Wall and fire experts from Singapore, are heading to the site to extinguish the fire and assess the damage. Wall said during a news conference in Perth today that a small fire on a vent had already been extinguished. Apache has invoked a clause in its supply contracts to remove liability for unavoidable catastrophes that prevent them from fulfilling obligations under the contract.

Retrieved from “https://en.wikinews.org/w/index.php?title=Apache_pipeline_fire_-_Varanus_Island,_Western_Australia&oldid=1059890”
Posted in Uncategorized